Mon - Sat: 7:00 - 17:00
+971 52 371 9388

Kitchen Renovation in Al Sama Townhouse Dubai with a Budget of 50,000 AED

PROJECT BACKERS

Project Overview:

  • Location: Al Sama Townhouse, Dubai
  • Budget: 50,000 AED

Objective: To transform the kitchen into a modern, functional, and aesthetically pleasing space, maximizing the use of the 50,000 AED budget to achieve a high-quality renovation.

Renovation Highlights:

  1. Cabinetry Update:
    • Before: Outdated and inefficient cabinets.
    • After: Installation of custom-built, high-gloss cabinets in a sleek, contemporary design. Soft-close mechanisms and pull-out shelves were added for enhanced functionality and convenience. The new cabinetry provides ample storage and a clean, modern look.
  2. Countertop Replacement:
    • Before: Worn and outdated countertops.
    • After: Elegant quartz countertops in a marble finish were installed, providing durability and a luxurious appearance. The countertops are stain-resistant and easy to maintain, making them perfect for a busy kitchen.
  3. Backsplash Installation:
    • Before: Plain and unremarkable walls.
    • After: A stylish subway tile backsplash in a glossy finish was added, creating a classic yet modern look. The backsplash not only protects the walls but also adds a touch of elegance to the kitchen.
  4. Flooring Upgrade:
    • Before: Old and worn flooring.
    • After: High-quality porcelain tile flooring was installed, offering a sophisticated look and excellent durability. The tiles are easy to clean and maintain, ideal for a kitchen environment.
  5. Appliance Update:
    • Before: Outdated and inefficient appliances.
    • After: State-of-the-art, energy-efficient stainless steel appliances were introduced, including a refrigerator, oven, stove, dishwasher, and microwave. These appliances enhance the kitchen’s functionality and aesthetic.
  6. Lighting Enhancement:
    • Before: Inadequate and outdated lighting.
    • After: A combination of LED recessed lighting, pendant lights over the island, and under-cabinet lighting was installed. This layered lighting approach ensures the kitchen is well-lit and creates a warm, inviting ambiance.
  7. Island Addition:
    • Before: Limited counter space and no island.
    • After: A new kitchen island was added, featuring additional storage, a prep area, and seating for casual dining. The island becomes the centerpiece of the kitchen, providing both functionality and style.
  8. Sink and Faucet Upgrade:
    • Before: Standard, worn-out sink and faucet.
    • After: Installation of an undermount stainless steel sink paired with a high-end, pull-down faucet. This upgrade not only improves the kitchen’s functionality but also adds a touch of luxury.
  9. Painting and Finishing:
    • Before: Dull and outdated wall colors.
    • After: The walls were painted in a soft, neutral color palette, enhancing the kitchen’s brightness and making it feel more spacious. The finishing touches, such as crown molding and baseboards, were also updated for a cohesive look.

Budget Breakdown:

  • Cabinetry: 15,000 AED
  • Countertops: 10,000 AED
  • Backsplash: 5,000 AED
  • Flooring: 8,000 AED
  • Appliances: 7,000 AED
  • Lighting: 2,000 AED
  • Island Addition: 2,000 AED
  • Sink and Faucet: 1,000 AED

Conclusion: The kitchen renovation in Al Sama Townhouse, Dubai, successfully transformed the space into a modern, functional, and elegant kitchen within the budget of 50,000 AED. The cohesive design elements and high-quality materials used in the renovation have significantly enhanced both the appearance and usability of the kitchen, making it a perfect space for cooking, dining, and entertaining.